
New TopShim run:

version = topshim 4.4.0
date = 2025-11-27
time = 11:26:19.861
command = topshim tunebxyz tuneaz ordmax=6

FINE SHIMMING

Parameters:

probe = Z113652_0123
solvent = DMSO
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 2.49 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration 2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.511


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	-451
Z2	-21
Z3	+61
Z4	+829
Z5	-66
Z6	-2440

duration = 1 min 29 sec
completed successfully
finished Thu Nov 27 11:27:48 2025


========================================================================
